Payen Flechair PA-112 - Top Motor Shaft Assembly

A - 2mm inner prop shaft - bent to catch free-wheeling plate (part B)

B - Free-Wheeling Plate (Easy Built)

C - Front Prop installed here - rotates correct direction

D - 2mm Thrust Bearing (FAI Supply)

E - Rear Prop gets epoxied here into brass tube rotates in opposite direction - note soldered brass key to prevent prop from slipping on tube also as stop up against washer F

F - Aluminum washer from Pop Rivets

G - Pop Rivet (3/16")- drilled to accept brass tube

H - 1/32 ply ring to help sand the correct shape and recess rivet G